Loi 13-09 (Morocco): Loi relative aux énergies renouvelables
In short
Loi n° 13-09 (dahir 1-10-16 du 11/02/2010) : Cadre de la production d'électricité renouvelable, y compris installations photovoltaïques raccordées.
Downloaded on · official PDF
Legal identity
- Official title
- Loi relative aux énergies renouvelables
- Type
- loi
- undefined
- Loi n° 13-09 (dahir 1-10-16 du 11/02/2010)
- Date of the text
- Status
- mandatory — en vigueur
- Downloaded on
- Issuing body
- État marocain
- Jurisdiction
- Morocco
- Language of the published text
- العربية
- Edition
- 2010
- Access
- official PDF · HTML text · État marocain
Official text (PDF)
Official text — source: État marocain — faithful copy of the published file, unchanged.
Open the PDF Download the PDF PDF · 0,7 Mo · 21 pages · العربية
Your browser does not display the PDF inline: open or download it with the buttons above.
- Licence
- Official Moroccan text, free to reproduce (Law 2-00 on copyright, art. 8)
- Attribution
- Texte officiel du Royaume du Maroc — État marocain. Copie conforme du fichier publié par adala.justice.gov.ma, sans modification.
- Source file
- adala.justice.gov.ma
- Downloaded on
- SHA-256 fingerprint
ffc963c37fa9f0ff5e78e70d190c24d7940629792cf6f6227df1cff404553da4
What it changes for your project
| Project type | What applies |
|---|---|
| Villa, single-family house | Project milestones : Detailed design (APD), calculation notes and consultants' drawings approved (Avant-projet détaillé (APD) et premières études techniques) |
| Apartment building | Project milestones : Detailed design (APD), calculation notes and consultants' drawings approved (Avant-projet détaillé (APD) et premières études techniques) |
| Subdivision, housing group | Project milestones : Detailed design (APD), calculation notes and consultants' drawings approved (Avant-projet détaillé (APD) et premières études techniques) |
| Facility, public-access building | Project milestones : Detailed design (APD), calculation notes and consultants' drawings approved (Avant-projet détaillé (APD) et premières études techniques) |
| Renovation, extension | Project milestones : Detailed design (APD), calculation notes and consultants' drawings approved (Avant-projet détaillé (APD) et premières études techniques) |
Sources and author
- Official text — source: État marocain — faithful copy of the published file, unchanged. adala.justice.gov.ma
- Downloaded on
- Published by CITURBAREA, the architecture and construction platform for Morocco, operated by HSE DECO. Official Moroccan texts are free of copyright (Law 2-00, art. 8).
Project phases
Detailed design · Tender documents
Trades concerned
Is your project concerned by this text? Estimate my project · Free video call with an architect · All guides · All official texts