Façade finishes in Morocco: how to choose, apply and price them

By , architect · Updated on · Reference texts (7)

Estimate my project →

A façade is the face of a building, but first of all it is a skin that has to withstand sun, rain and, by the sea, salt. Here are the possible finishes, the rules to know and the 2026 prices from the CITURBAREA simulator, for a house, a development apartment building or a facility.

In short: in Kénitra, the CITURBAREA simulator (version 2026-10, calculated on 23/10/2026, contractor selling prices excluding VAT) prices two coats of vinyl façade paint on primer at 65 MAD/m² excl. VAT (55 to 80) and siloxane paint at 75 MAD/m² excl. VAT (65 to 95), on sound render ready for painting. Three-coat external render, scaffolding included, adds 80 MAD/m² excl. VAT. Bonded natural stone cladding comes to about 700 MAD/m² excl. VAT, a price built up by the engine because no installed stone price has been recorded. Changing the look of an existing façade requires an authorisation.

Your budget, calculated for your project

Overall estimate by trade in 2 minutes, free and with no commitment, then a free video call with a registered architect. The detailed cost study (bill of quantities) is included in a full architectural design assignment; ordered on its own, it is paid.

Estimate my project → Start my file

📹 Free video call with the architect →

Disclaimer: published costs are indicative outputs of the CITURBAREA estimator (October 2026 version), not binding quotations, technical designs or compliance certificates. Apartment buildings and public-use facilities require project-specific drawings, specialist studies, applicable regulations and contractor quotations.

Which façade finish should you choose?

How much does a façade cost per m² in 2026?

Installed itemContractor, MAD excl. VAT/m²Contractor, incl. VAT/m²Labour-only, excl. VAT/m²
Three-coat external render, scaffolding included80 (65-105)9555
Vinyl façade paint, two coats on primer65 (55-80)8045
Siloxane façade paint, two coats on primer75 (65-95)9055
Bonded natural stone cladding (built-up price)700 (580-820)840500

Method note: CITURBAREA simulator, version 2026-10, calculated on 23/10/2026; contractor selling prices excl. VAT in Kénitra (regional coefficient 0.93), supply and fitting; incl. VAT = excl. VAT × 1.20; prices rounded to the nearest 5 MAD. Paint and primer: October 2026 retail prices, presumed to include VAT, converted to excl. VAT. Bonded stone: price built up by the engine from 2 cm polished local stone and tile adhesive, with no mechanical fixings (assumption; no installed façade stone price recorded). Labour-only column: materials bought by you at merchant prices, labour without a contractor's margin, excl. VAT; the VAT treatment depends on the provider's tax status and must be stated on the quote.

Rounding: amounts excluding and including VAT and quantities are each shown after rounding, so the product of the visible values may differ from the total by a few dirhams. Contract calculations must start from unrounded quantities and unit prices.

Paint prices assume a surface ready for painting: sound, dry, dust-free render. In the simulator, scaffolding is counted with the external render, so a rendered façade that is only being repainted needs a separate scaffolding item. To apply these prices to your own areas and city, run an estimate in the simulator.

Supply only, retail prices recorded in October 2026 give about 14 MAD per kilo of vinyl façade paint (30 kg tub) and about 49 MAD per litre of siloxane, converted to excl. VAT by the simulator. Shops do not state their VAT treatment, so these prices cannot be compared directly with an installed price excl. VAT. To compare ranges, decorative renders and stones, open the materials library (free account).

Your budget, calculated for your project

Overall estimate by trade in 2 minutes, free and with no commitment, then a free video call with a registered architect. The detailed cost study (bill of quantities) is included in a full architectural design assignment; ordered on its own, it is paid.

Estimate my project → Start my file

📹 Free video call with the architect →

What the price includes, and what it excludes

What the simulator prices include:

What they exclude, unless the quote says otherwise:

For a house or villa

For a 150 m² two-storey villa (R+1) in Kénitra (VILLA type in the simulator, calculated on 23/10/2026), the façade package (render and finish) comes to about 38,000 MAD excl. VAT in mid-range finish (262 m² of render and vinyl paint), about 69,000 MAD excl. VAT in good finish (siloxane and 20% stone) and about 101,000 MAD excl. VAT in high-end finish (40% stone). Render itself is covered in our guide to cement render. For a renovation, diagnosing the substrate matters as much as the price per m²: photograph cracks and damp areas before asking for quotes.

For a development apartment building

R+4 apartment building: a feasibility estimate, not a bill of quantities. The amounts shown come from a simulation scenario (1,200 m², 11 flats, Kénitra, parameters of 23/10/2026). Before any investment decision, the client needs a fixed brief, a preliminary take-off per trade, soil and structural studies, utility connection conditions and the requirements of the competent services, a contingency allowance and comparable quotations. Items already included in one package must not be added a second time.

For a 1,200 m² R+4 apartment building in Kénitra (IMMEUBLE type, five levels, two party walls, mid-range finish, calculated on 23/10/2026), the simulator counts 511 m² of three-coat rendered façade with vinyl paint, about 74,000 MAD excl. VAT (60,000 to 95,000). In good finish, with siloxane paint and about 100 m² of bonded stone, the package rises to about 133,000 MAD excl. VAT.

To weigh paint, stone and cladding across a whole scheme, start from a feasibility study and developer's appraisal, with the bill of quantities for the façade package.

Developers: have the economic feasibility of your plot analysed: saleable areas, common parts, parking options, structure, utility connections, forecast cost per package and permit risks. Ask for an initial scoping review; detailed studies and costings are covered by a contractually defined assignment.

For a facility (school, clinic, hotel, shop)

Schools, clinics, hotels, shops and warehouses: requirements vary. Fire safety, accessibility, sanitary facilities, ventilation, operational safety and permits depend on the precise use, the number of occupants, floor areas, number of storeys and the activity. Regulatory references must be checked for the project concerned. The CITURBAREA simulator offers an indicative estimate by type of building open to the public (school or nursery, clinic or medical practice, hotel or riad, shop, offices, warehouse or workshop), based on a standard brief and on price and ratio assumptions still to be confirmed: no ratio is a quotation for this kind of project.

For a 1,000 m² private school on two levels (R+1) in Kénitra (the simulator's "school or nursery" ERP type), free-standing, mid-range finish, the simulator gives about 84,000 MAD excl. VAT (68,000 to 109,000) for 585 m² of three-coat render and vinyl paint (calculated on 24/10/2026). This is an indicative estimate: the standard brief and the share of glazing are assumptions still to be confirmed. What changes:

Facility owners: ask for a brief scoping review before any costing: capacity, flows and operation, security and fire safety, maintenance, technical needs, permits and overall operating cost. A specific consultation will determine which studies to commission. For a first order of magnitude, run the simulator's ERP costing, then book a brief scoping appointment.

Do you need a permit to redo a façade?

In a new project the façade is part of the building permit: materials and colours appear on the drawings signed by the architect, and the zoning plan or subdivision regulations may impose colours, materials or projections. On an existing building, any change to the look of the façade requires an authorisation: see our guide on which works permit you need. In a medina or near a listed monument, law no. 22-80 on the conservation of historic monuments and sites also makes works subject to authorisation.

How is the work carried out?

  1. Diagnose the substrate: sound or cracked render, damp, salt, old chalking paint.
  2. Treat cracks and joints: open and fill, façade sealant at joints between materials.
  3. Apply the primer suited to the substrate.
  4. Apply two finishing coats in dry weather, neither in full sun nor in strong wind.
  5. For stone: flat, clean substrate, exterior-grade adhesive, joints, and mechanical fixings where the specification or the engineer requires them.
  6. Protect joinery, floors and balustrades during the work, then clean.

What are the most common mistakes?

What does the architect check?

Before finishing, the architect checks the render (flatness, cracks, corners), sills and joints, colour and stone samples, and the compatibility of products with the substrate. Exposed façades are hosed during the joinery check. At final acceptance, a year later, waterproofing and façades are checked again after a winter.

Which standards and regulations apply?

Standards are paid documents: we give only their reference and subject. The project specification (CPS) states which ones are contractual.

NF DTU documents are French rules: they are not Moroccan law, but they become contractual when the specification cites them.

How do you price your façade?

Measure the façade areas, openings deducted, and note the condition of the substrate. To choose materials and colours that respect your neighbourhood's regulations, or to read quotes that do not describe the same work, the architect can look at your façade with you during a video call with the architect.

Applicable standards and regulations

References ranked by precedence (Moroccan texts first). Detailed sheet: status, scope, access to the text.

All standards for "Façades" →

2026 reference prices — Façades

Public reference prices from the CITURBAREA materials library (October 2026), in dirhams excluding VAT; 20% VAT on top (incl. VAT = excl. VAT × 1.2), Rabat-Salé-Kénitra base. These are benchmarks, not supplier prices.

MaterialFrom (excl. VAT)From (incl. VAT)Range excl. VATReliability
Peinture de façade13,9 DH / kg16,68 DH / kg13,9 DH – 16,7 DHB
Peinture de façade siloxane49,2 DH / L59,04 DH / L49,2 DH – 58,3 DHB
Enduit monocouche de façade2,5 DH / kg3 DH / kg2,5 DH – 4,5 DHC (indicative)
Ossature de façade aluminium150 DH / ml180 DH / ml150 DH – 450 DHC (indicative)
Panneau composite aluminium (ACM)250 DH / m²300 DH / m²250 DH – 600 DHC (indicative)
Pierre de taille180 DH / m²216 DH / m²180 DH – 350 DHC (indicative)
Travertin220 DH / m²264 DH / m²220 DH – 370 DHC (indicative)
Benolith 203V, colle/émulsion vinylique pour griffi 1 kg29,2 DH / kg35,04 DH / kg29,2 DH – 29,2 DHC (indicative)

25 materials for this trade in the materials library. Gros œuvre · Menuiserie aluminium & PVC · Marbre, pierre & zellige · Peinture & enduits · Étanchéité

See products, data sheets and supplier prices

Detailed offers by supplier, technical data sheets and product comparison are reserved for account holders. The account is free; no contact details are exchanged, everything goes through CITURBAREA.

Create my free account → Professional? Create my pro space

Estimate my project Book a call

Frequently asked questions

How much does façade painting cost per m² in Morocco?

The CITURBAREA simulator (calculated on 23/10/2026, Kénitra, contractor) gives 65 MAD/m² excl. VAT for two coats of vinyl paint on primer and 75 MAD/m² for siloxane, on render ready for painting. With a labour-only subcontractor and materials you buy, allow about 45 and 55 MAD/m² excl. VAT.

How much does stone façade cladding cost?

The simulator estimates it at about 700 MAD/m² excl. VAT installed (580 to 820), a price built up from 2 cm polished local stone and adhesive, as no installed façade stone price has been recorded. Ask for a quote stating the stone, thickness and fixing method.

Which paint is best for a façade in Morocco?

A dedicated façade paint, classified under NM EN 1062-1. Vinyl is the cheapest; siloxane resists rain better and lets the wall breathe; a waterproofing coating suits cracked façades.

Do I need permission to change my house façade?

Yes: changing the external appearance requires an authorisation, and the zoning plan or subdivision regulations may impose materials and colours. In a medina or near a listed monument, law no. 22-80 also makes works subject to authorisation.

Why is my façade paint blistering?

Usually because of damp in the wall or a poorly prepared substrate (cracked render, chalking old paint, no primer). The cause must be treated before repainting.

How much does the façade of a 150 m² villa cost?

For a 150 m² R+1 villa in Kénitra, the CITURBAREA simulator gives about 38,000 MAD excl. VAT in mid-range finish (render and vinyl paint on 262 m²) and about 101,000 MAD excl. VAT in high-end finish with 40% stone (calculated on 23/10/2026).

Are façade prices excluding or including VAT?

Simulator prices exclude VAT; add 20% VAT when the contractor charges it. Prices displayed by shops rarely state their VAT treatment, so they cannot be compared directly with an installed price excluding VAT.

For which city and date are these prices valid?

They are calculated for Kénitra on 23/10/2026, with paints priced in October 2026. The simulator applies a coefficient per city (Kénitra 0.93, Casablanca 1.06, Rabat 1.07): rerun the estimate for your city.

Craftsman's quote or contractor's quote: what should I compare?

A labour-only subcontractor often prices labour alone while you buy the materials: the total is lower, but supervision and guarantees rest with you. A contractor supplies, fits and answers for the work; either way, the quote must state substrate preparation, scaffolding, number of coats and VAT treatment.

Who is responsible for what on a façade?

The contractor or craftsman answers for workmanship and the products supplied; the architect designs the façade, approves samples and checks the work; the engineering consultant steps in for heavy stone, cladding or curtain walling. You, as the client, approve colours and materials and obtain the authorisation.

Reference texts (7)

Start my fileWhatsAppAppeler

Read next

All guides → · Standards library →

Stay informed

Material prices, new planning rules and site advice: one letter a month, written by an architect.

▶ Subscribe to the YouTube channel Channel of architect Yassine AT-TARASSI: sites, prices and procedures on video.
Create my free account →

Ce contenu est consultable uniquement en ligne sur citurbarea.com. هذا المحتوى متاح فقط على الموقع citurbarea.com