Planning violations in Morocco: inspections, penalties and regularisation (law 66-12)
What you risk in Morocco if you build without a permit or without following your approved drawings, under law 12-90 as rewritten by law 66-12, article by article.
In short: since law no. 66-12 (2016), which rewrote the penalties of law 12-90, building without a permit exposes you to a fine of 10,000 to 100,000 DH (art. 71), adding an unauthorised storey to 50,000 to 100,000 DH and up to three months in prison (art. 72), and building on public or collective land without authorisation to 100,000 to 200,000 DH (art. 77). Violations are recorded by inspectors with the status of judicial police officers, who can stop the site on the spot. Demolition can be ordered by the administration, then by the court. The project owner, the contractor, the architect and the engineers are co-offenders if they do not report the violation within 48 hours (art. 78).
Your permit, prepared by an architect
A registered architect studies your plot, draws the plans and files your application. First call with no commitment.
Which acts are violations?
Article 64 of law no. 12-90, as worded by law 66-12, lists them:
- building or starting to build without a permit;
- building without following the drawings and documents of the permit issued;
- building in a zone where building is not allowed under the regulations;
- building on public or private land of the State or local authorities, or on collective land, without authorisation;
- occupying a building without an occupancy permit (permis d'habiter) or certificate of compliance (certificat de conformité);
- building on land subject to an alignment order (art. 34, paragraph 2);
- not keeping the site logbook (cahier de chantier) (art. 54-2).
The law also requires a permit for any change to a façade (art. 40) and a demolition permit for any demolition, even partial (art. 63-1). The same rules exist for subdivisions (law no. 25-90, art. 63 et seq.) and for rural settlements (dahir of 25 June 1960, art. 12-4 et seq.).
Who inspects?
Violations are recorded in an official report drawn up by (art. 65):
- judicial police officers;
- planning inspectors (contrôleurs de l'urbanisme) reporting to the wali, the governor or the administration, who have the status of judicial police officers and can call on the police.
The inspector acts on his own initiative, at the request of the local authority, the president of the commune or the director of the urban agency, or on a complaint from anyone, a neighbour for example (art. 66). Before 2016, prosecution required a complaint from the president of the commune; that is no longer the case. To enter occupied premises, the inspector needs written authorisation from the public prosecutor, within three days (art. 66).
Your permit, prepared by an architect
A registered architect studies your plot, draws the plans and files your application. First call with no commitment.
The procedure, step by step
- Recording and official report: the original is sent to the King's prosecutor within 3 days; copies go to the local authority, the president of the commune, the director of the urban agency and the offender (art. 66).
- Immediate stop of the works if the site is active, with a copy of the report (art. 67).
- If the order is not respected: seizure of tools, equipment and materials, closure of the site and sealing (art. 67). The offender can ask the judge to reopen it; in case of conviction, the court orders confiscation.
- If the violation is not serious and can be remedied: order to end it within 10 days to one month (art. 68).
- Failing that: demolition order by the local administrative authority; if the demolition is not carried out within the set deadline, an administrative committee chaired by the wali or the governor, with the president of the commune, carries it out within 48 hours, at the offender's expense (art. 68).
- Criminal prosecution before the court, independent of the demolition (art. 69).
For the most serious violations (no permit, or non-compliance on height, storeys, siting, floor area, soundness, materials or use), the demolition procedure applies (art. 70). When the building without a permit is on public or collective land, or in a zone where building is not allowed, the local authority demolishes of its own motion, at the offender's expense (art. 70).
The penalties set by law
| Violation | Penalty | Article (law 12-90) |
|---|---|---|
| Building without a permit or in a zone where building is not allowed; altering an existing building without a permit | 10,000 to 100,000 DH; for a repeat offence within the year, 1 to 3 months in prison | Art. 71 |
| Not complying with the permit: height, volumes, siting, floor area, use | 10,000 to 50,000 DH | Art. 72, para. 1 |
| Adding one or more unauthorised storeys | 1 to 3 months in prison and 50,000 to 100,000 DH, or either penalty | Art. 72, para. 2 |
| Changing a façade without a permit | 2,000 to 20,000 DH | Art. 73 |
| Building on land subject to an alignment order | 10,000 to 100,000 DH | Art. 74 |
| Occupying the building yourself without an occupancy permit | 2,000 to 10,000 DH | Art. 75, para. 1 |
| Renting or making it available to a third party without an occupancy permit | 10,000 to 100,000 DH | Art. 75, para. 2 |
| No site logbook | 5,000 to 10,000 DH, doubled in a medina or near a historic monument | Art. 76 |
| Building on public or private land of the State or local authorities, or on collective land, without authorisation | 100,000 to 200,000 DH | Art. 77 |
Fines are cumulative (art. 79) and doubled for a repeat offence within the year (art. 80). In case of conviction, the court must order demolition and restoration, at the offender's expense (art. 80-1).
For subdivisions, law 25-90 provides heavier penalties: from 100,000 to 5,000,000 DH for a subdivision, housing group or land division without authorisation (art. 65), and up to five years in prison for a subdivision in a zone where building is not allowed or for selling plots in an unauthorised or not formally accepted subdivision (art. 66 and 68, 2016 wording). Law no. 34-21 of 28 July 2026 rewrote several articles of this chapter: see land subdivision.
Who is liable: owner, architect, contractor?
Article 78 names as co-offenders, punished like the main offender, the project owner, the contractor who carried out the works, the architect, the specialised engineer and the surveying engineer (ingénieur géomètre topographe) if they do not report the violation within 48 hours of learning of it, as well as anyone who gave the orders or facilitated the operation. In practice, an architect who discovers a storey added outside the permit must report it; if the architect stays silent, they face the same penalty as the owner.
This is one of the reasons why the permit requires an architect registered with the Order (art. 50): the architect directs the works, keeps the site logbook (art. 54-2) and certifies compliance at the end of the works (art. 55). Our architect's practice in Kénitra provides this supervision.
Can an irregular building be regularised?
Law 12-90 provides for a regularisation permit (permis de régularisation) issued by the president of the commune, after approval by the urban agency (art. 40). Its conditions are set by decree no. 2-18-475, amended by decree no. 2-23-103 of 8 May 2023:
- it covers buildings built without a permit or not in line with the permit (art. 5);
- the building must comply with the rules on safety, hygiene and sanitation, and with the height, siting, floor area and use set by the planning documents, and lie in a zone open to urbanisation (art. 9);
- otherwise, a building permit must first be obtained to bring the building into compliance (art. 9);
- in an irregular subdivision, regularisation is only possible after its restructuring (art. 10);
- the permit is issued within 60 days of filing (art. 8) and replaces the occupancy permit (law 12-90, art. 55).
Two important limits. First, the 2023 decree reopened the filing of applications for two years; according to the press, that window ended in May 2025, and we have found no text reopening it since. Check with the commune and the urban agency before counting on this route (the regional planning and housing agencies created by law no. 64-23, BO no. 7533 of 10 August 2026, are gradually replacing the urban agencies as they are actually set up). Second, regularisation does not erase the offence: demolition "does not hinder" prosecution (art. 69), and nothing in the texts provides that a regularisation permit ends prosecution.
What always remains possible: filing an application for an amending building permit for a project that complies with the zoning plan, which often means demolishing the non-compliant part. A storey that exceeds the height allowed by the zoning plan does not meet the conditions of article 9.
How to stay out of trouble
- Check whether the plot can be built on with the zoning information certificate before buying.
- Obtain the permit before digging, and follow the building permit procedure; for small works, ask for a repair permit.
- Any change during the works (storey, façade, opening) goes through a new application.
- Do not occupy or rent before the occupancy permit.
- Plan the real budget from the start, with the cost estimator, so you are not tempted to add unauthorised floor area. For all the texts, see planning and building regulations in Morocco and the building permit guide.
The amounts are those of the law; the judge sets the fine within these ranges. Inspection practice varies from one prefecture or province to another.
Frequently asked questions
What is the fine for building without a permit in Morocco?
From 10,000 to 100,000 DH (article 71 of law 12-90 as amended by law 66-12). For a repeat offence within the year, the offender also faces one to three months' imprisonment.
What do you risk for a storey added without authorisation?
One to three months in prison and a fine of 50,000 to 100,000 DH, or either penalty (article 72). Demolition of the storey can be ordered by the administration and must be ordered by the court in case of conviction (article 80-1).
Who can report an illegal building?
Anyone can file a complaint: the planning inspector acts on his own initiative, at the request of the authorities or on a complaint (article 66 of law 12-90).
Is the architect liable for the owner's violations?
Yes, if the architect does not report the violation within 48 hours of learning of it: the architect is then a co-offender, like the contractor and the engineers (article 78).
Can a house built without a permit still be regularised?
The regularisation permit exists (decree 2-18-475), but the filing window reopened for two years in May 2023 ended in May 2025 according to the press. Check with the commune and the urban agency before taking any step.
Can you rent out a home without an occupancy permit?
No. An owner who makes a building available to a third party without an occupancy permit faces a fine of 10,000 to 100,000 DH; if the owner occupies it personally, 2,000 to 10,000 DH (article 75).
Does demolition end the prosecution?
No. The law states that demolition does not prevent prosecution and does not stop prosecution already under way (article 69).
Reference texts (5)
- Loi n° 66-12 relative au contrôle et à la répression des infractions en matière d'urbanisme et de construction, dahir n° 1-16-124 du 25 août 2016 — BO n° 6501 (arabe) ; traduction BO n° 6770 du 18 avril 2019
- Loi n° 12-90 relative à l'urbanisme, dahir n° 1-92-31 du 17 juin 1992
- Décret n° 2-18-475 (permis de réfection, régularisation, démolition), version consolidée avec le décret n° 2-23-103 du 8 mai 2023
- Agence urbaine de Kénitra-Sidi Kacem — textes et circulaires (dont la circulaire n° 2812 du 1er avril 2024 sur la régularisation)
- Le Matin — Urbanisme : agences régionales et guichet unique pour les grands projets (loi 64-23, août 2026)